< Back to Complete Project

EPC EOR JIRAK WATERFLOOD PROJECT, 2019

Year           : 2019

Location  : Jirak, Sumatera

Client         : PT. Pertamina EP

Scope of work :

EPC EOR JIRAK WATERFLOOD PROJECT, consist of :

1.   Gross Handling Unit :

      - Skimming Tank

      - FWKO (Free Water Knock Out)

2.   Water Treatment and Injection Plant :

      - Produced and Treated Tanks

      - Pretreatment System

      - Nutshell Feed Pump

      - Nutshell Filtration System

      - Induced Gas Floatation System

      - Decanter Tank

      - CPI Tank

      - Chemical Injection System

      - Water Injection Pump

3.   Power Generating System :

      - 4×75MW Gas Engine Generator System

      - MV and LV Switchgear

      - Emergency Diese Engine Generator

      - UPS System

4.   Utility System :

      - Instrument Air and Utility Air System

      - Utility Water System

5.   Supporting System :

      - SCADA, PCS, SIS, ESD System

      - FM 200, Watermist, Hydrant and Fire Alarm System

      - Telecommunication System

      - Lighting Indoor and Outdoor System

      - Grounding and Lightning Protection

      - Civil Control Building, Sub Station Building, Open shelter and Dormitory

6.   Interfacing with Existing Facilities :

      - Electrical Power System

      - Piping System

      - Instrumentation System

Product Installed :

- Demulsifier

- Filtration System

- Storage Tanks

- Scada System

- Electrical, Instrument , Control System

- Valve, Fittings

PT. Pratiwi Putri Sulung

Office :

Jl. Wibawa Mukti No. 89
P: +62 21 2938 8858
F: +62 21 2938 8859

Workshop :

Jl. Wibawa Mukti No. 34
P: +6221 822 1694
F: +6221 822 3942

Jatiasih - Bekasi 17425,
Indonesia
www.pratiwi.com | info@pratiwi.com

Contact Person

Sales and Marketing :

Elvira Agustina
elvira@pratiwi.com