Year : 2019
Location : Jirak, Sumatera
Client : PT. Pertamina EP
Scope of work :
EPC EOR JIRAK WATERFLOOD PROJECT, consist of :
1. Gross Handling Unit :
- Skimming Tank
- FWKO (Free Water Knock Out)
2. Water Treatment and Injection Plant :
- Produced and Treated Tanks
- Pretreatment System
- Nutshell Feed Pump
- Nutshell Filtration System
- Induced Gas Floatation System
- Decanter Tank
- CPI Tank
- Chemical Injection System
- Water Injection Pump
3. Power Generating System :
- 4×75MW Gas Engine Generator System
- MV and LV Switchgear
- Emergency Diese Engine Generator
- UPS System
4. Utility System :
- Instrument Air and Utility Air System
- Utility Water System
5. Supporting System :
- SCADA, PCS, SIS, ESD System
- FM 200, Watermist, Hydrant and Fire Alarm System
- Telecommunication System
- Lighting Indoor and Outdoor System
- Grounding and Lightning Protection
- Civil Control Building, Sub Station Building, Open shelter and Dormitory
6. Interfacing with Existing Facilities :
- Electrical Power System
- Piping System
- Instrumentation System
Product Installed :
- Demulsifier
- Filtration System
- Storage Tanks
- Scada System
- Electrical, Instrument , Control System
- Valve, Fittings
Jl. Wibawa Mukti No. 89
P: +62 21 2938 8858
F: +62 21 2938 8859
Jl. Wibawa Mukti No. 34
P: +6221 822 1694
F: +6221 822 3942
Jatiasih - Bekasi 17425,
Indonesia
www.pratiwi.com | info@pratiwi.com
Elvira Agustina
elvira@pratiwi.com