Year : 2018
Location : Bontang, Kalimantan
Client : PT. Badak LNG
Scope of work : Engineering Procurement and Construction 3 MW Solar Power Plant, includes :
(i) Engineering
(ii) Procurement
(iii) Construction
(iv) Technical Examination & Testing
(v) Pre-Commissioning
(vi) Commissioning Phase
(vii) Installation Acceptance
(viii) Final Acceptace
(ix) Operation and Maintenance Training
(x) Land preparation and licensing
Product Installed :
- Solar Cell, Inverter
- DC Combiner & AC Combiner
- Low Voltage Panel
- Transformator
- Medium Voltage Panel
- Kiosk Panel
- SCADA System
- CCTV System